Text Size: A+| A-| A   |   Text Only Site   |   Accessibility
OWEB Logo
OWEB Grant Proposal Types
Watershed Restoration
Upland Erosion Control (UEC)
a. Road improvement (RI)
b. Road removal (RR)
c. Road drainage improvement (RDI)
d. Water/sediment control basins (WSCB)
e. Windbreaks (W)
f. Upland terracing (UT)
g. Planting upland areas (PUA)
h. Meadow protection (MP)
i. Reduced tillage (RT)
 
Grazing Management (GM)
a. Grazing management plans (GMP)
b. Water gap development (WGD)
c. Livestock water / off-channel (LWO)
d. Range seeding (RS)
 
Vegetation Management (VM)
a. Brush / weed control / eradication (BWCE)
b. Controlled burning (CB)
c. Conifer thinning (CT)
d. Juniper clearing (JC)
e. Invasive species management (ISM)
 
Riparian Area Enhancement (RAE)
a. Riparian vegetation planting (RVP)
b. Riparian fencing (RF)
c. Riparian conifer restoration (RCR)
d. Riparian conservation programs (RCP)
 
Channel and Bank Alteration (CBA)
a. Re-establish historical channel (RHC)
b. Develop meanders / side channels (DMSC)
c. Channel relocation (CR)
d. Bank stabilizing riprap (RR)
e. Bank bioengineering (BB)
f. Bank sloping (BS)
g. Gully control (GC)
h. Bank stabilizing barbs (BSB)
 
Fish Passage Improvement (FPI)
a. Fish passage structures (FPS)
b. Alternatives to push-up dams (APD)
c. Correcting road/stream crossings (CRSC)
d. Fish screen improvement/replacement (FSIR)
 
Stream Habitat Enhancement (SHE)
a. Large wood placement (LWP)
b. Instream boulder placement (IBP)
c. Off-channel habitat creation (OCHC)
d. Miscellaneous full spanning weirs (MFSW)
e. Pool construction (PC)
f. Miscellaneous deflector structures (MDS)
g. Log, boulder structures (LBS)
h. Salmonid carcass placement (SCP)
i. Beaver management (BM)
 
Instream Water Enhancement (IWE)
a. Irrigation efficiency projects (IEP)
b. Irrigation efficiency (IE)
 
Estuarine Restoration/Enhancement (ERE)
a. Tidegate removal / improvement (TRI)
b. Dike breaching / removal (DBR)
c. Channel reconfiguration (CR)
 
Wetland Enhancement (WE)
a. Excavation / removal of fill (ERF)
b. Elimination of drainage structures (EDS)

Land and Water Aquisition
Land Acquisition (LA)
a. Conservation easements (CE)
b. Fee simple acquisition (FSA)
 
Water Acquisition (WA)
a. Instream water transfer (IWT)
b. Instream water lease (IWL)

Assessment and Action Plan
Watershed Assessment (WAS)
a. Staffing/contracting (SPM)
b. Assessment equipment purchase (AEP)
c. Watershed mapping (WM)
 
Restoration Action Planning (RAP)
a. Staffing/contracting (SC)
b. Materials/equipment (ME)
c. Administrative expenses (AE)

Monitoring
Monitoring (M)
a. Fish monitoring (FM)
b. Macroinvertebrate monitoring (MM)
c. Water quality monitoring (WQLM)
d. Water quantity monitoring (WQNM)
e. Estuarine and wetland conditions (EWC)
f. Aquatic habitat conditions (AHC)
g. Riparian conditions (RC)
h. Upland conditions (UC)
i. Restoration project effectiveness (RPE)
j. Monitoring equipment purchase (MEP)

Education/Outreach
Watershed Education (WED)
a. Education/Outreach coordination (EOC)
b. Education/Outreach materials (EOM)
c. Training/Outreach events (TOE)

Watershed Council Support
Watershed Council Support
a. Watershed council support

 
Page updated: September 10, 2007

Get Adobe Acrobat ReaderAdobe Reader is required to view PDF files. Click the "Get Adobe Reader" image to get a free download of the reader from Adobe.